Critical Path PMI PDU Training Certificate, Portrait
Get the matching set
A portrait PDU certificate that records the PDUs, Talent Triangle split, ATP number and claim code, with two signatures and a QR code at the foot.
Use this design
Add your logo and wording, then send it to everyone at once, each with a link anyone can verify.
Start freeFree for up to 20 recipients a year
Share this design
- A4 and US Letter, composed for each
- Your logo, colours and wording
- A QR code on every copy that proves it is real
- Matching digital badge in the same design
Updated 14 November 2026 · Designed by the Hyperstack studio
More designs like this
What is on it
A complete record, not just a name
You write once
The same for everyone. Keep the template’s words or change them.
- Title
- Certificate of Completion
- Statement
- A line of thanks or achievement, written for this topic
- Skills practised
- Risk identification, Probability and impact, Response planning and Risk reviews in sprints
- Details
- duration, level and format
- Signatures
- Director of Training and Lead Instructor, PMP
Filled in for each person
Hyperstack fills these from your list when you send.
- Recipient name
- Program or award name
- Issue date
- Credential ID
- QR code to the verification page
Specifications
Sizes, fonts and colours
Sizes
- A4
- 210 × 297 mm · 8.27 × 11.69 in
- US Letter
- 8.5 × 11 in · 216 × 279 mm
Fonts
- Playfair Display
- Title, Recipient name
- Manrope
- Text, Labels
- Mrs Saint Delafield
- Signatures
Google Fonts, free for commercial use.
Colours
- Paper#fbf9f4
- Ink#16233a
- Accent#1f3a5f
- Second accent#a4741f
- Muted text#586171
Change any colour in the studio.
Design notes
The portrait certificate is the same activity node, set on its side: ATP number, PDUs and completion date across the top, then the title, the name and the course. Below come a statement, the skills practised beside the Talent Triangle split in three lines, the duration, level and format, and two signatures. The brass critical-path arrow leaves the box at the right edge and turns down to a FINISH node at the foot that holds the QR code. It suits PM academies and university extension schools that keep paper and digital records.
About
PDU Certificate Template, Critical Path Portrait
A PMI audit asks for proof of each activity a certification holder reported in CCRS, and the learner uploads it to an audit package. A tall page suits that file, a printed folder or a PDF beside other course records. The provider sends it when the course ends, whether it is an Authorized Training Partner with a claim code or a training company whose PDUs the learner reports under Education.
Wording on the template“Completed every session of this course, with practical work in finding, sizing and answering risk on agile and hybrid projects. The PDUs above count toward PMI CCR.”More wording ideas for pmi pdu training certificates
Words that go with it
The email and the post, written for you
Email to send with it
Subject: name, your PDU certificate for this course is ready
Dear name,
Thank you for completing the course with us. Your certificate is ready. It shows the course, the completion date, the PDUs you earned and how they split across the Talent Triangle, together with the activity details you need in CCRS.
Report the PDUs in CCRS soon, then download the PDF and keep it with your certification records in case of an audit. You can print a copy and share your badge on LinkedIn. The QR code lets anyone confirm the record in seconds.
Good luck with the rest of your cycle.
Hyperstack fills in each person’s name and link when it sends.
Post for the recipient to share
Four more PDUs toward my PMP renewal: I have just completed Agile Risk Management. The most useful part was bringing risk reviews into each sprint instead of saving them for a monthly meeting. I am trying it with my team next week. #PMP #ProjectManagement #ContinuingEducation
Recipients share it with one click from their credential page, with the badge attached.
Printing
Printing it well
Print at actual size
Choose “Actual size” or 100% in the print dialog, not “Fit to page”, so the margins and the QR code keep their size.
Use card, not paper
A matte or silk card of 200–300 gsm (about 80–110 lb cover) feels like an award and does not curl in a frame.
Frame it
A4 fits a standard 21 × 29.7 cm frame; US Letter fits an 8.5 × 11 in frame, or an 11 × 14 in frame with a mat. Hang it upright, as designed.
Mind the edges
Most home printers leave a thin white border. For a design that runs to the edge, use a print shop or your printer’s borderless setting.
Certificate or badge?
Send both. They do different jobs.
Certificate
- A full record: name, statement, skills, dates and signatures
- Printed and framed, or kept as a PDF
- Opens to a page anyone can verify
Digital badge
- A small image people put on LinkedIn and in email signatures
- Carries the verified details inside it (Open Badges 2.0)
- One click shows who earned it and who issued it
How to send it
From template to everyone’s inbox
- 01
Make it yours
Open the template, add your logo and change any colour or word.
- 02
Add your people
Upload a spreadsheet, or connect your LMS, HR tool or form.
- 03
Send it
Each person gets an email and their own credential page, in one go.
- 04
They share it
Recipients add it to LinkedIn; anyone can verify it from the QR code.
Free for up to 20 recipients a year
It comes in A4 (210 × 297 mm) and US Letter (8.5 × 11 in). Pick the paper in the studio; the layout is composed for each one, not stretched.
Playfair Display (title, recipient name), Manrope (text, labels), Mrs Saint Delafield (signatures). All are Google Fonts, free for personal and commercial use, and you can swap any of them in the studio.
Yes. Every text, colour and drawing is its own layer in the studio. Add your logo in the logo spot; the design keeps its balance with a wide or a square logo.
Yes. Each recipient gets their own credential page, where they download a PDF in the paper size you chose, or share a link that anyone can verify.
Yes. This design is part of a set: Critical Path PMI PDU Training Badge and Critical Path PMI PDU Training Certificate. Issue them together so the certificate and the badge read as one award for pmi pdu training.
More certificate templates
All certificate templates
Landscape certificate · A4 + US Letter
ANCC NCPD Certificate, Landscape

Landscape certificate · A4 + US Letter
AOTA CEU Certificate, Landscape

Landscape certificate · A4 + US Letter
APA CE Certificate, Landscape

Landscape certificate · A4 + US Letter
ASWB ACE CE Certificate, Landscape

Landscape certificate · A4 + US Letter
Accreditation Certificate, Landscape

Landscape certificate · A4 + US Letter
Scrum Master Certificate, Landscape

Landscape certificate · A4 + US Letter
Business Analysis Completion Certificate

Landscape certificate · A4 + US Letter
Business Management Certificate
Browse by topic
Trusted by universities, enterprises and certification bodies worldwide
Your next cohort deserves better than a PDF
Set up in minutes, send your first credentials today, and only pay once you grow past 20 recipients a year.
Or open a live sample credential













